BUILDING THE FUTURE TOGETHER

Intersection Safety Analysis at the Entrance to Archerfield Airport

 

Project Traffic Signage and Stopping Sight Distances at Archerfield Airport
Client Archerfield Airport Corporation
Project Value < $100k
Project Overview The client required an engineering assessment to determine the impact of a new pylon sign in accordance with the following standards:

  • Manual of Uniform Traffic Control Devices (MUTCD) Queensland and its supplements;
  • Traffic and Road Use Management (TRUM) manual; and
  • Australian Standard (AS)1742 MUTCD.
JJR Involvement The installation of the new pylon was confirmed to have no affect on the safety of the intersection, including:

  • Stopping Sight Distance (SSD);
  • Safe Intersection Sight Distance (SISD); and
  • Approach Sight Distance.