Excellence in Engineering, Infrastructure and the Built Environment

Intersection Safety Analysis at the Entrance to Archerfield Airport

Project Traffic Signage and Stopping Sight Distances at Archerfield Airport
Client Archerfield Airport Corporation
Project Value < $100k
Project Overview The client required an engineering assessment to determine the impact of a new pylon sign in accordance with the following standards:

  • Manual of Uniform Traffic Control Devices (MUTCD) Queensland and its supplements;
  • Traffic and Road Use Management (TRUM) manual; and
  • Australian Standard (AS)1742 MUTCD.
JJR Involvement The installation of the new pylon was confirmed to have no affect on the safety of the intersection, including:

  • Stopping Sight Distance (SSD);
  • Safe Intersection Sight Distance (SISD); and
  • Approach Sight Distance.