Structural Inspection for Repair Work at Mordialloc Rotunda
Service :
Location :
Project :
Structural Inspection for Repair Work at Mordialloc Rotunda
Client :
Kingston City Council
Project Value :
Project Overview :

After running condition inspections and rating the conditions of structures for construction, the Kingston City Council had requested JJR services to inspect the works of construction and repairs.

JJR Involvement :

JJR utilised 3 x Hold Points during the construction phase to ensure the construction of the repair work were executed in accordance with approved standards and practices. After each Hold Point a brief report indicating the inspected areas and the highlights of the inspection was provided to Council.

The Scope of works included the hold points for inspection:

Hold Point 1:

  • After removal of concrete; and
  • Before installation of steel bars.

Hold Point 2:

  • After removal of concrete; and
  • After installation of new bars.

Hold Point 3:

  • After injecting new concrete.