Hume City Council engaged JJR to conduct a Level 3 bridge inspection of the Bridge along Malcolm Street and provide cost estimates for required remediation work.
JJR’s experienced engineers conducted a Level 3 inspection to assess the bridge’s structural integrity in accordance with VicRoads Standards, client requirements and general industry practice. The team provided the client with a Level 3 inspection report that included key findings of the site inspection, photographic evidence, and a detailed cost estimate for the removal and replacement of structural elements of the bridge.
Established in 2010, JJ Ryan Consulting was born with a commitment to deliver unparalleled excellence geared towards ensuring the enduring success of our clients’ businesses and assets.