Detailed Design for Flood Wall, Sherwood Avenue, Kingston
Project :
Detailed Design for Flood Wall, Sherwood Avenue, Kingston
Client :
Kingstone City Council
Project Value :
Project Overview :

Kingstone City Council engaged JJR to conduct a detailed design for Sherwood Avenue flood wall as part of flood mitigation project.

JJR Involvement :

JJR’s expert team undertook a structural design and calculation in accordance with the relevant Australia Standards including:

  • 0:2002 Structural design actions – General principles;
  • 1:2002 Structural design actions – Permanent, imposed and other actions;
  • 2:2021 Structural design actions – Wind actions;
  • AS4678:2002 Earth-retaining Structures; and
  • AS3600:2018 Concrete structures AS4100:2020 Steel structures.

The client was provided with a report, which included the identification of potential data, as well as structural analysis and calculations for the concrete wall design.