BUILDING THE FUTURE TOGETHER

Concept Design of Options to Improve Runoff from a Maintenance Washdown Bay at Archerfield Airport

Project Concrete Wash Down Bay Options Analysis
Client Archerfield Airport Corporation
Project Value < $100k
Project Overview Archerfield Airport required a hydraulic analysis of the concrete wash down bay to determine the feasibility of increasing the depth of the interceptor for additional water use.
JJR Involvement The project involved:

  • Site inspection of the wash down bay and interceptor trap;
  • Analysis of the current capacity and operational efficiency; and
  • Options analysis to determine the best option for increasing the capacity of the wash down bay.