Temporary Works Connection Design for Speedsafe Product to Timber Fascia

Project Temporary Works Connection Design for Speedsafe Product to Timber Fascia
Client Advanced Group Edge Protection Scaffolding
Project Value < $1M
Project Overview Advanced Group Edge Protection Scaffolding engaged JJR to calculate design loadings for the Speedsafe product to be connected to a structurally sound fascia.
JJR Involvement JJR’s expert engineers calculated the design load and designed the connection in accordance with AS4100, AS4994 and AS1170.