BUILDING THE FUTURE TOGETHER

Design for the Bruce Highway Upgrade – C2SIW – Package 2 – Construction Phase

Project Design for the Bruce Highway Upgrade – C2SIW – Package 2 – Construction Phase
Client Fulton Hogan Construction
Project Value > $100M
Project Overview Fulton Hogan Construction was responsible in the work services for the Bruce Highway (Caboolture-Bribie Island Rd Interchange to Steve Irwin Way) and has engaged JJR to partner and run Traffic management consultancy services.

Detailed Design for Temporary Traffic Management (TTM) were requested and JJR has provided packages of drawings Sets for the project execution.

JJR Involvement As part of the work Structure, JJR has included in the scope:

• Space check if the concept traffic staging as provided was suitable and identify any improvements that may be suitable (following consultation with FHC).
• Temporary drainage design
• Temporary pavement design
• Temporary street lighting design
• Temporary road safety barriers
• Temporary signage
• Temporary line marking