BUILDING THE FUTURE TOGETHER

Concept Design for Road Upgrades Along the Haulage Route for the Marulan South Limestone Mine

Project Concept Design for Road Upgrades Along the Haulage Route for the Marulan South Limestone Mine
Client Boral Cement
Project Value $1M – $10M
Project Overview Boral Cement engaged JJR to undertake a concept geometric design for the proposed road infrastructure upgrade, which included an existing road alignment for one portion of Marulan Road, and a greenfield alignment for the second portion of the road upgrade package.
JJR Involvement JJR’s team of experienced engineers completed the concept road design in accordance with Austroads Standards and Goulburn Mulwaree Council’s requirements. Deflection testing, geotechnical investigations and reporting, assessment of the existing pavement condition, and remaining pavement life was considered in the preparation of the concept road design.