Project Level 2 and 3 Bridge Inspections and Concept Designs for Multiple Bridges within the Hobart City Council Region Client Hobart City Council Project Value < $1M Project Overview The Hobart City Council (the Council) engaged JJR to conduct Level 2 and 3 structural inspections and prepare concept designs for multiple bridges within the Council […]

Deflection Criterion Assessment for C...

Project Deflection Criterion Assessment for Carpark Solar Shade Structures Client Powerpark Project Value $1M – $10M Project Overview PowerPark Systems (client) engaged JJR to undertake a review, calculation and risk assessment of deflection criterion for car park solar shade structures. JJR Involvement JJR expert structural engineers prepared a technical report, which reviewed the Duomax Dual […]

Level 3 Bridge Inspections and Struct...

Project Level 3 Bridge Inspections and Structural Analysis, Hobart, Tasmania Client Hobart City Council Project Value < $100k Project Overview Hobart City Council (Council) engaged JJR to undertake Level 3 Inspections for eight bridges, with asset management and service outputs for six of the bridges. Concept design for upgrades were prepared for the remaining two […]

Level 2 Condition Assessments for 22 ...

Project Level 2 Condition Assessments for 22 Retaining Walls, Hobart Client Hobart City Council Project Value < $100k Project Overview Hobart City Council (Council) engaged JJR to undertake twenty-two (22) Level 2 retaining wall structural inspections and assessments in accordance with the VicRoads, ‘Road Structures Inspection Manual’ (RSIM). JJR Involvement Structural inspections and assessments were […]

PowerPark Structures, Column Cut-Out ...

Project Column Cut-Out and Grouting Client PowerPark Project Value < $100K Project Overview Powerpark is a JJR valued partner on many projects and engaged our team to provide engineering design services for columns cut out and grouting that will provide sufficient structural capacity to resist loads the specified member is required to carry. JJR Involvement […]

Detailed Design and Documentation for...

Project Detailed Design and Documentation for Installation of a Gross Pollutant Trap (GPT) Client Hobart City Council Project Value < $1M Project Overview Hobart City Council engaged JJR to provide a detailed design and documentation for the installation of a Gross Pollutant Trap (GPT). JJR Involvement The scope of works for JJR included: Geotechnical investigations […]

Montpellier Retreat Footpath Widening...

Project Montpellier Retreat Footpath Widening Design Client City of Hobart Project Value $1M – $10M Project Overview JJR provided civil engineering design services relating to the provision of concept design drawings for the footpath along Montpelier Retreat. The footpath was widened to 2.4m and served to increase ease of access and safety for pedestrians within […]

Darling Parade to Benjafield Terrace ...

Project Darling Parade to Benjafield Terrace Pedestrian Walkway Reconstruction Detailed Design Client City of Hobart Project Value $1M – $10M Project Overview The City of Hobart was seeking a pedestrian walkway reconstruction from Darling Parade to Benjafield Terrace. JJR Involvement JJR was engaged to develop the detailed design of the pedestrian walkway reconstruction. This included […]

PowerPark, Column Cut-out and Groutin...

Client PowerPark Systems Project Value <$1M Project Overview PowerPark Systems manufactures architecturally elegant steel shade structures for large carparks to house solar panels and provide shaded parking areas. Power park sought to design a column cut out and grouting for steel shade structures. JJR Involvement In this scope of work, JJR considered factors involved with […]

PowerPark Systems, Research and Devel...

Client PowerPark Systems Project Value <$1M Project Overview PowerPark Systems manufactures architecturally elegant steel shade structures for large carparks to house solar panels and provide shaded parking areas. The nature of their structures is not well-served by suggestions on limits of deflection for serviceability limits states checks. JJR Involvement In this scope of work, JJR […]