The client was required to submit detailed design drawings in accordance with the SEQ W&S D&C Code, certified by a Registered Professional Engineer Queensland (RPEQ) for a property in Mermaid Beach.
CCTV survey of the existing sewer pipeline was obtained to confirm that the condition of the existing system could facilitate additional load.
The CCTV survey outcomes and deliverables included:
Welcome to JJ Ryan Consulting! Thank you for your interest in our services. Please fill out the form, and our designated contact person will reach out to you shortly.