The client enquired about the structural capacity of an existing structure to support a new gym to be erected. The live load capacity of the structure needs to meet the requirements of the load bearing capacity for a gym.
JJR Involvement :
The project involved an on-site inspection to undertake a site survey and to establish structural geometry and layout. The elements included in the inspection were limited to internal areas and the external walls.
A final report summarised that the structure was unable to carry live loads greater than 4kPa and therefore was unable to be certified for gym use, which requires a structural load bearing capacity of 5kPa live load.
Scroll to Top
Get Quote
Welcome to JJ Ryan Consulting! Thank you for your interest in our services. Please fill out the form, and our designated contact person will reach out to you shortly.