Archerfield Airport required a pavement condition assessment of the hangar adjacent to building 115 at the airport. An inspection report was to be developed highlighting any and all defective areas of the hangar’s pavement.
JJR Involvement :
A pavement condition assessment was undertaken to analyse the current condition of the hangar and summarise findings. The project included:
Pavement site inspection;
Summary of observed defects and general observations;
Geotechnical and pavement information; and
Breakdown of minimum requirements for asphalt pavement repairs.
Scroll to Top
Get Quote
Welcome to JJ Ryan Consulting! Thank you for your interest in our services. Please fill out the form, and our designated contact person will reach out to you shortly.