Archerfield Airport required the design of a fuel truck for airside operations to cause as little damage as possible to the existing pavements of both the surface and base layers.
JJR Involvement :
The scope of the design and analysis included:
Determination of appropriate vehicle specifications (GVM, number of axles, tyre pressure, tyre widths);
Analyse vehicle impact based on existing runway accommodation of 5.7 tonnes;
Investigation into the potential for a retrofitted fuel tank onto an existing chassis; and
Final summary of analysis and specification recommendations.
Scroll to Top
Get Quote
Welcome to JJ Ryan Consulting! Thank you for your interest in our services. Please fill out the form, and our designated contact person will reach out to you shortly.