Archerfield Airport Corporation (AAC) engaged JJR to assess infrastructure deterioration between the apron and taxiway pavement and of the collar around the trench drain along the airside hangar entrance.
JJR Involvement :
An inspection of Archerfield Airport was undertaken by JJR structural engineers to assess infrastructure. Data was collated and analysed, specifications were calculated, with a calculation report and design drawings completed in preparation of rectification works.
Scroll to Top
Get Quote
Welcome to JJ Ryan Consulting! Thank you for your interest in our services. Please fill out the form, and our designated contact person will reach out to you shortly.