Paroo Shire Council (the Council) engaged JJR to carry out a Level 3 bridge inspection of the Deep Creek bridge. The bridge is located within Wyandra, Queensland and was originally a 3-span timber structure, that has since been strengthened with steel components.
JJR Involvement :
A condition assessment of the Level 3 bridge was conducted by JJR’s experienced engineers, with a comprehensive condition assessment report prepared and delivered to the Council, which included:
Review of the most recent Level 2 inspection report of the bridge;
The outcome of a visual inspection of structural components;
A condition assessment involving pile coring and geotechnical testing of the base and sub-base of the abutment area; and
A recommended management and monitoring plan.
Scroll to Top
Get Quote
Welcome to JJ Ryan Consulting! Thank you for your interest in our services. Please fill out the form, and our designated contact person will reach out to you shortly.