Brown Contractors (BC) engaged JJR to undertake the design of the Palmer Bridge replacement project for Southern Downs Regional Council. The bridge was a three-span timber bridge of length 25m with carriageway width of 5.5m across the bridge.
JJR’s expert engineers prepared Final Design drawings for the replacement of the Palmer Bridge, which included a desktop review of all existing information including detailed review of geotechnical and asset information, as well as a site inspection prior to preparation of Final Design drawings in accordance with the following standards and guidelines:
Established in 2010, JJ Ryan Consulting was born with a commitment to deliver unparalleled excellence geared towards ensuring the enduring success of our clients’ businesses and assets.
Welcome to JJ Ryan Consulting! Thank you for your interest in our services. Please fill out the form, and our designated contact person will reach out to you shortly.