Brown Contractors (BC) engaged JJR to undertake the design of the Palmer Bridge replacement project for Southern Downs Regional Council. The bridge was a three-span timber bridge of length 25m with carriageway width of 5.5m across the bridge.
JJR’s expert engineers prepared Final Design drawings for the replacement of the Palmer Bridge, which included a desktop review of all existing information including detailed review of geotechnical and asset information, as well as a site inspection prior to preparation of Final Design drawings in accordance with the following standards and guidelines:
Welcome to JJ Ryan Consulting! Thank you for your interest in our services. Please fill out the form, and our designated contact person will reach out to you shortly.