JJR was engaged by Archerfield Airport Corporation (AAC) to conduct a technical evaluation of the recently reconstructed pavement for Runway 10L/28R and Taxiway Bravo at Archerfield Airport.
JJR Involvement :
JJR’s experienced engineers conducted a technical evaluation to assess the structural integrity and confirm the Pavement Classification Number (PCN) of the newly reconstructed runway. A report was prepared that included key findings which was based on the Falling Weight Deflectometer (FWD) testing results.
Scroll to Top
Get Quote
Welcome to JJ Ryan Consulting! Thank you for your interest in our services. Please fill out the form, and our designated contact person will reach out to you shortly.