NSW Ports required assessment of the existing steel bridge structure spanning between the BLB1 working platform and the northern dolphin to whether forklifts could be utilised to access the dolphin.
No drawings etc. were available regarding the bridge structure and therefore the bridge required additional inspection to be physically to confirm dimensions and structural details.
JJ Ryan Consulting intends to first conduct the site inspection to record structural information so that the structural analysis of the bridge can be undertaken. The inspection scope includes the following components:
JJR subsequently undertook detailed design of structural reinforcement to ensure that the carrying capacity of the structure was sufficient for the new design loads.
Established in 2010, JJ Ryan Consulting was born with a commitment to deliver unparalleled excellence geared towards ensuring the enduring success of our clients’ businesses and assets.
Welcome to JJ Ryan Consulting! Thank you for your interest in our services. Please fill out the form, and our designated contact person will reach out to you shortly.