Fulton Hogan requested JJR’s team to develop an Airport Impact Assessment (AIA) to ensure that the requirements are met for the NSW Roads & Maritime Service (RMS) Scope of Works and Technical Criteria (SWTC).
JJR Involvement :
The scope of work for JJR included an assessment of the following elements around Illawara Regional Airport:
Review of FHC’s Pre-IFC design documentation;
Current Obstacle Limitation Surface (OLS) and existing obstacles for existing runways;
A “future” OLS model prepared;
The “future” OLS model is assessed against construction works and any concerning obstacles;
Road and vehicle lighting impacts assessed on Pre-IFC for permanent works design;
A wind shear and turbulence assessment was undertaken in accordance with National Aerodrome Safeguarding Framework (NASF) Guideline; and
A draft AIA report and risk assessment associated with the proposed permanent works.
Scroll to Top
Get Quote
Welcome to JJ Ryan Consulting! Thank you for your interest in our services. Please fill out the form, and our designated contact person will reach out to you shortly.