The Clover Switchyard upgrade includes construction of the following:
Earthworks for the extension of the 66kV switchyard platform and re-grading the existing 66kV switchyard and associated drainage works.
Modification to existing road.
Extension to the security fencing.
New transformer slab, fire wall and bunded area for new 66/11kV transformer.
Oil containment system for new transformer bunded area.
Rebuild of 66kV switchyard including circuit breaker, disconnector, VT, Post insulator, Gantry and 66kV Pole structures and footings.
JJR Involvement :
We assisted our client to assess the roof structural capacity for Australian Standard loads, including dead loads, live loads, snow loads (due to the alpine region) and earthquake loads.