Downer Group was engaged by the Australian Grand Prix Corporation to construct upgrades to four turns on the Formula 1 Track in Albert Park.
This track has supported the hosting of Formula 1 races in Melbourne since it was first planned in 1993, after the circuit was constructed from new and existing roads around Albert Park.
JJR Involvement :
JJR utilised our considerable pavement design experience to provide Downer Group with engineering design services, certification and construction support services for kerb and pavement upgrades to the following turns:
• Turn 4 Drivers Left
• Turn 4 Drivers Right
• Turn 11 Drivers Right
• Turn 12 Drivers Right