City of Kingston (Council) engaged JJR to undertake a condition rating of 11 precast concrete light poles and 600m of reinforced concrete balustrading, which were identified with severe cracking, and located at Peter Scullin Reserve, Mordialloc Beach.
JJR Involvement :
The scope of inspection work included:
Estimate location and concrete cover to steel reinforcing of the typical precast concrete pole using Ground Penetrating Radar equipment;
Undertake a Drummy Survey to estimate extent of reinforcing corrosion in accessible portions of concrete poles with severe cracking;
Condition rating of concrete balustrades; and
Condition assessment report, including inspection data, analysis, and recommendations.