Port of Melbourne engaged JJR to provide short to medium term drainage options to mitigate inundation of the Wooldumpers Shed site, including suitability of the building slab.
JJR’s expert team reviewed the existing slab condition assessment report, the slab survey, contours and colour band surface, and provided the client with a high-level memorandum, which included an analysis of suitable options to mitigate the potential post-demolition drainage issues and a preferred methodology to best rectify the slab drainage for site safety and slab integrity.
Established in 2010, JJ Ryan Consulting was born with a commitment to deliver unparalleled excellence geared towards ensuring the enduring success of our clients’ businesses and assets.
Welcome to JJ Ryan Consulting! Thank you for your interest in our services. Please fill out the form, and our designated contact person will reach out to you shortly.