BUILDING THE FUTURE TOGETHER

Detailed Design Works for Concrete Widening of Slabs at Frankston Waterfront

Project Detailed Design Works for Concrete Widening of Slabs at Frankston Waterfront
Client Frankston City Council
Project Value $1M – $10M
Project Overview The Frankston City Council engaged JJR to design improved access to the Frankston beach for the Frankston Surf Life Saving buggy while also improving the immunity of the access to significant storm events.
JJR Involvement For this project, JJR supplied surveying and engineering design services.

JJR undertook a swept path analysis to optimise geometry of the beach access via concrete ramps, with a structural tie-in detail to the existing slab.

JJR managed to review the survey data and develop two concept design options, along with an associated cost estimate and detailed design of the preferred option.