BUILDING THE FUTURE TOGETHER

Project Management of Upgrades to QG ...

Project Structural Assessment of Airport Hangar Client Queensland Government (QG) Air Project Value < $100k Project Overview The client required a structural assessment of an existing structure within an airport hangar of floor size 33m2 to determine its adequacy for utilisation as a gym facility. JJR Involvement The structural capacity was assessed for use as […]

Structural Certification of Hangar 6 ...

Project Structural Certification of CareFlight Hangar at Archerfield Airport Client Archerfield Airport Corporation Project Value < $100k Project Overview The CareFlight Hangar at Archerfield Airport experienced issues with the doors which was determined to potentially be caused by structural modifications to the hangar. An assessment of the structural integrity of the hangar was required for […]

Design Management of the Foxground to...

Project Design Management of the Foxground to Berry Bypass Client Fulton Hogan Construction Project Value > $100M Project Overview Secondment into the Design Manager role for Fulton Hogan for the Foxground & Berry Bypass for a four-lane highway with median separation for 11.6km of the Princes Highway. JJR Involvement The responsibilities of the design manager […]

Apron, Taxiway and Runway Upgrade Ten...

Project Apron & Taxiway Upgrade and Runway Reseal Tender for Cloncurry Airport Client RMS Engineering & Construction Pty Ltd Project Value < $100k Project Overview The Cloncurry Airport required maintenance and repair works on the taxiways and surrounding geography. The scope of construction works included: Reconstruction of high strength pavements for code C taxiway A […]

Concept Design of Options to Improve ...

Project Concrete Wash Down Bay Options Analysis Client Archerfield Airport Corporation Project Value < $100k Project Overview Archerfield Airport required a hydraulic analysis of the concrete wash down bay to determine the feasibility of increasing the depth of the interceptor for additional water use. JJR Involvement The project involved: Site inspection of the wash down […]

Airfield Hangar Column Rehabilitation

Project Column Rehabilitation of Hangar 7 at Archerfield Airport Client Archerfield Airport Corporation Project Value < $100k Project Overview Archerfield Airport required a structural inspection of Hangar 7, in particular the front column which was showing signs of corrosion with complete loss of section in the web. The client requested the development of a permanent repair […]

Airport Boundary Fence Footing and Dr...

Client Barton Road Airport Boundary Fence Footing and Drainage Repairs Client Archerfield Airport Corporation Project Value < $100k Project Overview It was identified that storm water was undermining the Archerfield Airport boundary fence on Barton Road. Archerfield planned to undertake drainage works along the existing grass swale to prevent scouring of soil and protect the fence […]

Installation of a New Generator

Project Installation of a New Generator for Queensland Police Service Client Archerfield Airport Corporation Project Value < $100k Project Overview Review and airport approval for the installation of a new generator for the Queensland Police Service (QPS). JJR Involvement Completion of the works in accordance with the master plan and other airport requirements.

Refurbishment of Airfield Hangar

Project Refurbishment of Hangar 5 at Archerfield Airport Client Archerfield Airport Corporation Project Value < $100k Project Overview The client required refurbishment of Hangar 5 at the airfield, including engineering design of the emergency egress (design of the ramp and associated structures) and project management during the handover and defect close-out phases. JJR Involvement The […]

Helipad Options Analysis and Concept ...

  Project Archerfield Airport Helipad Options Analysis & Concept Design Client Archerfield Airport Corporation Project Value <$1M Project Overview The client required engineering design, superintendent and project management services – for a new helipad at the airport – to undertake an options analysis and develop a concept design considering: Flight paths and obstacles; Suitability of […]